Hedcor, a subsidiary of Aboitiz Power Corp. is conducting a feasibility study to assess hydropower potential within Kitaotao, Bukidnon. The company seeks to set up another plant in the Bukidnon province. The planned plant is to have a capacity between sixty to one hundred twenty megawatts.
The project is part of AboitizPower’s plan to increase their renewable energy portfolio. It is currently at 914.5 MW, with only 484.5 MW of it hydroelectric. The rest are geothermal. At present, Hedcor is building a 68.8 MW hydroelectric project in Impasug-ong and Manolo Fortich, which are both in Bukidnon.